Production Materials Transfer

A change has been made to Production Material Transfer. When a Finished Product has been marked as ‘Non-Operable’ and Production Material Transfer is run, the product marked Non-Operable will no longer be found.

If a Finished Product that is marked as ‘Non-Operable’ is included as a Sub-Build, Production Materials Transfer will treat the product marked as Non-Operable as if it was a regular product. It will only include the product marked as Non-Operable, not the products that make up the Sub-Build.